cement plants

cement plant

Capacity of the plant is 4000 tons per day, 2 product lines with each 2000 tons.

Price for the plant is 52.000.000 Euro

Incl. disassembling, technological obsolescence, sand blasting, finishing,
engineering, shipping and assembling of the plant at destination.
All manufacturers Germany/Europe.
The basic structure is form 1985, but the inner life is new or renewed.
The burners are completely renewed, the customer can to determine which is burn want – gas, oil, coal, diesel or waste.
Support and scientific management as well as training and introduction of the local staff at customers site are included. Duration of this support with our staff is 24 months after set-up (commissioning of the plant).
Commissioning of the plant (incl. disassembling, shipping and assembling):
Line 1 = one year after contract is signed
Line 2 = six months after line 1
Warranty period : 24 months
Payment:
35 % become due when signing the contract
35 % become due on the day when shipping documents are forwarded to customers
20 % become due when the plant arrives at destination
10 % become due within 30 days from the day when the works are completed
Please note: zivilworks as fundament, buildings, streets, bus bar etc, are not included in this price. Within 30 – 45 days after signing the contract and receiving 1. payment, the client will get all relevant plans for fundament and building.
HM 2010
Soft offer cement plant
valid for 7 consecutive days
Capacity of the plant is 3000 tons per day, 2 product lines with each 1500 tons.

Price for the plant is 34.400.000 Euro


Incl. disassembling, technological obsolescence, sand blasting, finishing and loading of the goods

Plus approx. 7.600.000 Euro

For engineering, shipping and assembling of the plant at destination.
All manufacturers Germany and Europe.
The burners are completely renewed, the customer can to determine which is burn want, gas, oil, coal, diesel or waste.
Support and scientific management as well as training and introduction of the local staff at customers site are included. Duration of this support with our staff is 24 months after set-up (commissioning of the plant).
Commissioning of the plant (incl. disassembling, shipping and assembling).
Line 1 = one year after contract is signed
Line 2 = six months
Warranty period : 24 months
Payment:
35 % become due when signing the contract
35 % become due on the day when shipping documents are forwarded to customers
20 % become due when the plant arrives at destination
10 % become due within 30 days from the day when the works are completed
Please note: zivilworks as fundament, buildings, streets, bus bar etc, are not included in this price. Within 30 – 45 days after signing the contract and receiving 1. payment, the client will get all relevant plans for fundament and building.
HM 2010
Soft offer cement plant
valid for 14 consecutive days
Capacity of the plant is 1500 tons per day, 2 product lines with each 750 tons.
Price for the plant is 24.400.000 Euro
Incl. disassembling, technological obsolescence, sand blasting, finishing and loading of the goods

Plus approx. 7.600.000 Euro

For engineering, shipping and assembling of the plant at destination.
All manufacturers Germany and Europe.
The burners are completely renewed, the customer can to determine which is burn want, gas, oil, coal, diesel or waste.
The basic structure is form 1981, but the inner life is new or renewed.
Support and scientific management as well as training and introduction of the local staff at customers site are included. Duration of this support with our staff is 24 months after set-up (commissioning of the plant).
Commissioning of the plant (incl. disassembling, shipping and assembling).
Line 1 = one year after contract is signed
Line 2 = six months
Warranty period : 24 months
Payment:
35 % become due when signing the contract
35 % become due on the day when shipping documents are forwarded to customers
20 % become due when the plant arrives at destination
10 % become due within 30 days from the day when the works are completed
Please note: zivilworks as fundament, buildings, streets, bus bar etc, are not included in this price. Within 30 – 45 days after signing the contract and receiving 1. payment, the client will get all relevant plans for fundament and building.
HM 2010