Used Factory For Concrete Walls

Used Factory For Concrete Walls

  • complete Plant for production of concrete walls
  • year 1996/97
  • built by H+H Celcon
  • latest state-of-the-art technology by SKAKO
  • capacity: 140,000 m2 – can be increased, mixer has double capacity
  • thickness of walls: 10 – 30 cm (usually 24 cm)
  • finished products are complete walls in light or normal concrete, with or without steel reinforcement
  • any length of the walls below table length can be produced. For instance beams of 20 cm and
  • walls of 1,5 m – 3 m – 14 m etc.
  • location: Europe

Enclosed you find the scope of supply

Cincopa WordPress plugin

USED FACTORY FOR CONCRETE WALLS
SCOPE OF SUPPLY:
•    2 x 7.3 m3 silo for feeding of conveyor belt
•    1 x outdoors desk for steering the conveyor belt
•    2 x insulated hydraulic hatches
•    2 x powerful vibrate engines
•    107 m complete conveyor belt type: 650 mm
•    Capacity
…..o 20 degrees : 83 kg/sec = 200 m3
…..o 30 degrees : 58 kg/sec = 140 m3
•    1 x high tower silo type 425/8 complete with steel construction
…..o Volume: 425 m3 (six chambers)
…..o Silo is bolted together
•    1 x crane bar for the service deck (10 m)
•    4 x powerful vibrate feet (26 kg)
•    2 x scales type TW 2250
•    Volume: 2,250 l
•    Scales capacity: 200 – 3,600 kg
•    2 x outdoors silos for cement and fly ash
•    Volume: 75 t/60 m3
•    Height: 10.25 m
•    Diameter: 3.2 m
•    2 x additive dosing machines
•    1 x additive scales type AVS 9-4
•    Volume 36 l
•    Max weight: 36 kg
•    1 x SKAKO concrete mixer Type SM 2250
•    1 x Aquamat water system
•    Volume: 2,250 l / 3,600 kg
•    Compact concrete: 1,500 l
•    2 x electric motors @ 37 kW
•    Weight: 9,300 kg
•    1 x funnel with vibrator
•    1 x filter system
•    Volume: 60 l
•    Air amount: 3,000 m3/h
•    1 x conveyor type SKAKO BC 2250 mono
•    Volume : 3,600 kg / 2,475 l
•    Speed from 0.5 – 2.0 m/sec
•    2 x additional safety stops BC 3000
•    284 m of electricity rail
•    284 m of driving rail with assembling furnishing
•    1 x Skakomat 20 process controlling computer
•    Process computer
•    Service desk
•    Sequence closet
•    Screen terminal
•    Printer
•    Calculator of volume
•    Calculator of price
•    Amount of prescriptions, etc.
•    The whole system in a 20ft container
•    3 x oil tanks (tables)
•    Approx. capacity 3,000 – 4,000 l
•    Engine and pipe system for all 15 tables
•    14 x tables width: 3.05 m / length: 16 m
•    1 x table width: 3.05 m / length: 12 m
•    All tables can raise and are prepared for vibrate engine
•    1 x hydraulic station for tables
•    15 x individual control boxes to raise, tilt (up to 90 degrees to enable easy
…..removal of finished product) time and heat each table
•    1 x element roller with a vibration beam
•    2 x element glitter machine
•    2 x transportation tables for moving the machinery, 3.5 m x 3.5 m
•    1 x machine for laying out hard concrete, belt width 1,000 mm, volume 3.0 m3
•    1 x machine for laying out light concrete, width 3,050 mm, volume 4.0 m3
•    260 m power rail
•    Gas boiler for hot water to the fifteen tables (2002)
•    Type: Betone BG 600 m
•    Capacity: 200 kW – 880 kW
•    Kettle : Geminox GP 500/550
•    Capacity: 582 kW / 1,040 kW
•    All connections to the table

Condition: excellent, system cleaned and silos emptied
Availability : immediately, subject to prior sale
Location : Europe

Dear Sir,

Price of new Factory:  about 7 Million Euro (equivalent to about 8.8 Mio USD)

Price of Factory from site:  2.120 Mio Euro (equivalent to about 2.67 Mio USD)

Price in USD to Euro = exchange rate at date of fulfillment of contract

Dismantling at site:  about 150,000.– to 200,000.– Euro

Shipment to port at customer’s country:  3,000.—to 5,000.– Euro per Container (number of containers is related to the volume of the dismantled factory)

Customs and insurances have to be done by customer himself

The concrete wall factory operated and is currently installed at site in North-Europe

For the costs of the reconstruction of the machinery at a new site it has to be calculated about 100,000.-Euro (this also would come up for a new factory)

Costs for specific infrastructure at new site and additional buildings have to be paid by customer (as for a new factory too)

We offer teaching and instruction of customer’s own staff at new site by experienced experts in this business. Costs to this are naturally related to the time customer needs this support, additionally  he has to pay for travelling and hotel expenses for this / these teaching expert / s

If customer asks for teaching his staff and management in other language than German or English he has to take care of a competent translator at his site

With our strong support the customer can start fast to produce concrete walls of European quality at his site

The customer has an opportunity with this which he cannot find every day again.

Please let him know that if there is a need of more than 5 containers we will take further costs for more containers.
Kind regards

Dr. Eng. Olaf Winkelmann
Euromid International (CEO)
www.euromid-int.de